
SB Energy, Inc.
SBEFiledSB Energy, Inc. · Nasdaq Global Select Market · latest filing 2026-09-21
SB Energy’s preliminary IPO remains unpriced, incomplete, and dependent on substantial project execution and financing.
As of the September 21, 2026 S-1/A, SB Energy had no disclosed IPO price, completed offering, or confirmed trading date.
Capital destination
Awaiting verificationS-1/A · 2026-09-21
Share-type percentages are not net-proceeds percentages. Amounts retain their stated gross/net basis; do not add unlike bases.
Check the source · S-1/A ↗Capital destination
Awaiting verificationS-1/A · 2026-09-21
Share-type percentages are not net-proceeds percentages. Amounts retain their stated gross/net basis; do not add unlike bases.
Check the source · S-1/A ↗Names not yet published
Fully diluted valuation bridge
| Status | Reference |
|---|---|
| Awaiting verification | Source ↗ |
Basic-price scenario
A verified single offer price and basic post-offer share count are required. This is a data gap, not a paid lock.
Check the source · S-1/A ↗OpenAI
5%Disclosure says more than 5%; exact percentage unavailable
SoftBank is expected to remain the controlling shareholder, but the supplied percentage fields are blank. Class N shares held by NVIDIA have identical economic rights to common stock but are non-voting, subject to conversion provisions. OpenAI is expected to have beneficial ownership on an as-converted basis and receives a board-designation right while it and controlled affiliates own more than 5%. · 2026-09-21
SoftBank is expected to remain the controlling shareholder, but the supplied percentage fields are blank. Class N shares held by NVIDIA have identical economic rights to common stock but are non-voting, subject to conversion provisions. OpenAI is expected to have beneficial ownership on an as-converted basis and receives a board-designation right while it and controlled affiliates own more than 5%.
One disclosed holder; not a complete ownership distribution.Check the source · S-1/A ↗Conditional lock-up timeline
| Status | Reference |
|---|---|
| Awaiting verification | Source ↗ |
Financial quality and runway
| Status | Reference |
|---|---|
| Awaiting verification | Source ↗ |
Latest filing update
Loading saved filing update…
SEC filing history
Loading filing history…
PORTS-Pike represents all contracted-but-not-under-construction data-center capacity and a substantial majority of DC backlog, creating concentration risk.
- Potential impact
- Awaiting verification
- Monitor
- Registration effectiveness and offering closing remain prospective; no verified date is supplied.